Yellow Freight System, Inc:
- Need energy efficient system that will result in cost savings.
Square D/Schneider Electric Meet Needs:
- Powerlink system installed
Benefits to Yellow Freight:
- Return on Investment = 6 months
- Average Savings Per Month = $1,721.50
- Savings to Date (10 months after system installed) = $17,215.00
"I want to thank all staff who was involved in making this retrofit a great success," Bud Day, Yellow Freight Building Maintenance Supervisor |